The goal of this project is to create a unified, functional, and internally consistent architectural and structural BIM passport of the provided building, developed by precisely modeling individual floors in separate files based on a single reference template and subsequently assembling them into a MASTER file. The key requirement is absolute geometric and vertical continuity of structures across all floors, with a critical focus on the vertical alignment of load-bearing elements and staircases (especially in underground levels), which takes precedence over the point cloud in the hierarchy of sources. Modelers are required to follow a strict methodology—including the rule of modeling ceiling slabs always within the lower story, the prohibition of creating custom layers or attributes, and mandatory weekly checks—to ensure a collision-free state and the technical accuracy of final PLN, IFC, and DWG exports, which are performed exclusively from the central MASTER file.
PLEASE FIND ALL REQUIRED DATA ENCLOSED BELOW:
1) MANUAL - https://drive.google.com/file/d/1QwATgISXRmprzMCuo8q89cvgkQY3zWl6/view'usp=sharing
2) MASTERPLAN FILE - https://1drv.ms/u/c/a0dcf62eaeeb66b0/IQCCHcZsJuaGRKeVeMnhksHFAQisOMJQK09N3kH9i3NjOs4?e=ajaoes
3) ARCHICAD LIBRARIES - https://1drv.ms/f/c/a0dcf62eaeeb66b0/IgCGOMfklmZdRqYHzYwqzKvQAVMesQcDZm0NIsqZY8riGkg'e=wNGPNi
4) VIRTUAL TOURS:
a) https://my.matterport.com/show/?m=15cVpj8vkFw (consists of floors 5, 6)
b) https://my.matterport.com/show/?m=iEhgoZ2fU4X (consists of floors 6, 7, 8)
5) OLD DOCUMENTATION (not fully accurate, but can help if needed) - https://drive.google.com/drive/folders/17PyWpKiYUZyWb7pGKICBC0DwUNJhHe7s'usp=sharing
DEADLINE OF THIS PROJECT IS 25/4/2026.
Apply Now
Apply Now